UDAJEE EARLY YEARS at NASHIK by Dhananjay Shinde Design Studio
The rectangular plot was a constraint in itself as a small width remained after leaving the necessary margins. So the plan was spread with courtyards between the pavilions along a north south passage. The total cost predicted at design stage was 65 lakhs, the project was completed in 70 lakhs.